We will conduct a controlled power outage in Server Hall G19 to test the capacity of the UPS and to analyze any potential consequences of a real power outage.
There is a small risk that both the wired and wireless networks in Building H (the Main Building) will be affected. This also applies to the network in Restaurant Kristina.